An inspection clause is often written as a courtesy: the buyer may look at the unit before shipment. That is not a remedy. A usable clause defines what is inspected, against which standard, within which window, by whom, and what happens when the unit fails. Without those five elements, the buyer has a visit, not a right.
Why an Inspection Right Needs Wording
An inspection right needs wording because a visit without a standard or consequence is not enforceable. The clause must create an obligation, a deadline and a remedy, or the seller can treat inspection as a favor that does not affect the sale.
In a negotiated equipment sale, the buyer usually has more leverage before payment than after delivery. The inspection clause converts that leverage into a contractual step. It should sit alongside the condition warranty, the acceptance test and the payment schedule, not replace them.
The clause also protects the seller by making the process predictable. A seller who knows the standard, the window and the decision rule can prepare the unit and avoid a dispute about what the buyer expected. A vague clause invites a dispute that neither side can win cheaply. The clause is a risk-allocation tool, not a checklist, and it deserves the same attention as the price. The regulatory context varies by market, from FDA rules and the EU Medical Device Regulation 2017/745 to MHRA, TGA and PMDA requirements, while WHO guidance frames the shared principles; the inspection clause should reflect the market the unit will enter.
Defining the Standard of Inspection
The standard should be the manufacturer\’s specification and service documentation for the model, with the manual as the final authority. Where the parties agree on a different standard, it should be written down and justified against the manufacturer\’s data.
\”Inspect the unit\” is not a standard. The clause should list the functions, outputs, safety checks and visual items to be examined, and it should reference the procedure or acceptance criteria. If the device has a performance verification procedure, use it. If the parties create a bespoke checklist, attach it to the contract. The standard should be attached as a schedule, not incorporated by a vague reference to good working order, which means different things to a clinician, an engineer and a broker.
The standard should also define what counts as a failure. A measured value outside the manufacturer\’s tolerance is a failure; a cosmetic mark is a different category. The clause should distinguish between defects that affect performance, safety or compliance and those that affect appearance only, so the remedy fits the finding.
Who Inspects and Where
The clause should name who may inspect: the buyer, a named third party, a qualified engineer or a combination. It should also state where the inspection happens, because a seller\’s site, a port and the buyer\’s facility expose different faults.
Pre-shipment inspection is useful for condition and completeness, but it may not reproduce the clinical environment or the buyer\’s power and network. Arrival inspection catches transport damage but may come after risk has passed. The clause can provide for both, with different purposes and different consequences.
Where a third-party inspector is used, the contract should identify the scope and the report format. The inspector\’s role is to test against the agreed standard, not to certify clinical suitability. Clinical suitability belongs to the treating clinician; equipment suitability belongs to biomedical engineering.
The Inspection Window
The inspection window should state when the buyer may inspect, how long the inspection lasts and how quickly the buyer must decide. A window that opens only after payment is not a pre-payment protection, and a window with no decision deadline leaves the seller in limbo.
The window should be tied to an event the parties can verify: notice of readiness, arrival at the port, delivery to the site or completion of installation. It should allow enough time for the agreed tests, including any warm-up, calibration or performance run the manufacturer\’s procedure requires.
If the buyer misses the window, the clause should say what happens. Deemed acceptance is common, but it should be explicit and should not apply where the seller prevented inspection. The clause should also preserve the buyer\’s rights for latent defects that could not reasonably be found within the window. A second inspection after delivery is not a duplicate if it tests different things. The first can check completeness and configuration; the second can check performance after transport and installation. The contract should say whether a failure at the second inspection is treated as transport damage, a latent defect or a breach of the inspection standard, because the remedy differs.
Access, Power and Test Conditions
The seller should provide access, power, test equipment and the documentation needed to perform the agreed inspection. If the buyer must bring its own equipment or engineer, the clause should say so and allocate the cost.
Test conditions matter for medical equipment. Voltage, grounding, temperature, network access, consumables and software access can all affect the result. The clause should identify who provides them and what happens if they are not available. An inspection performed under the wrong conditions can produce a false pass or a false failure.
The buyer should also confirm that the site has the utilities and access the test requires. A unit that needs compressed air, cooling water, a network connection or a specific power configuration cannot be fully tested in a warehouse that lacks them. If the inspection must be partial, the certificate should say what was not tested and why. The clause should also require the seller to make available the service records, software version, accessory list and any calibration certificates relevant to the tests. An inspection that cannot see the configuration is only a visual check.
Outcome 1: Pass and Proceed
If the unit passes, the clause should define the next step: a signed inspection certificate, a payment trigger, a shipping authorization or an acceptance record. A pass should be documented, not communicated verbally.
The certificate should identify the unit, the standard used, the tests performed, the results and the person who approved them. It becomes part of the transaction file and supports the acceptance decision later. Where the buyer\’s lender or insurer requires evidence, the certificate is the document they will ask for.
A pass should not waive defects that the inspection could not reasonably detect. The clause should preserve the buyer\’s rights for latent defects, misdescription and title issues, even after a successful inspection.
Outcome 2: Remedy, Price Adjustment or Rejection
If the unit fails, the clause should give the buyer a defined choice: repair and re-inspect, a price adjustment, replacement, or rejection with a refund. The choice should be tied to the severity of the failure and the time available.
A minor nonconformance may justify a price adjustment; a safety-related failure may justify rejection. The clause should say who decides and on what evidence. If the seller has a right to cure, the cure period and the re-inspection standard should be stated.
Rejection should include practical mechanics: who pays return freight, who bears risk during return, how the unit is decontaminated and when the refund is due. A rejection right without those details can be more expensive than the defect.
Cost Allocation
The clause should allocate the cost of inspection, re-inspection, test equipment, travel and return freight. A common structure is that the buyer pays for its own inspection and the seller pays for re-inspection after a failure, but the parties can agree otherwise.
Cost allocation should follow the outcome. If the unit passes, the buyer\’s inspection cost is part of its due diligence. If the unit fails and the seller cures, the seller should bear the cost of the re-test. If the parties disagree, the clause should say who bears the cost pending resolution. Where the seller refuses a re-inspection after a cure, the buyer should have a defined fallback: a credit, a price adjustment or rejection. The clause should not make the buyer choose between accepting an unverified cure and abandoning the contract.
| Inspection record | What it proves | What its absence leaves open |
|---|---|---|
| Inspection scope and standard | What was tested and against which criteria | Whether the inspection was adequate |
| Test equipment calibration | That the measurements are traceable | Whether the results can be relied on |
| Test results and photographs | The condition at the stated date | Whether a later fault existed at inspection |
| Nonconformance report | What failed and how severely | Whether the remedy matches the finding |
| Cure or waiver record | What was corrected or accepted | Whether the buyer preserved its rights |
| Inspection certificate | Who approved the unit and on what basis | Accountability for the pass decision |
| Cost allocation record | Who pays for inspection and re-inspection | Whether the remedy is commercially real |
The first seven days after delivery guide covers the acceptance-testing sequence that follows the inspection. More contract and records guides are in the Knowledge section.
If you are drafting an inspection clause and want the standard, window and remedy reviewed before signature, send the draft to the HHG team.
Questions About Inspection Clauses
What is an inspection clause?
An inspection clause is a contract term that gives the buyer a right to examine the equipment against a defined standard within a stated window, and sets out what happens if it fails. It should identify who inspects, where, using which criteria, and the remedy for a nonconformance.
Should I inspect equipment before shipment?
Pre-shipment inspection is useful because the buyer still has leverage before payment and freight. It can catch condition, completeness and configuration problems, but it may not reproduce the destination power, network or clinical environment. A second acceptance check after delivery is often appropriate.
Who pays for inspection?
The contract should allocate the cost. A common approach is that each party pays for its own inspection, and the seller pays for re-inspection after a failure that it must cure. The clause should also say who bears travel, test equipment and return freight.
Can I reject equipment after delivery?
Only if the contract gives you that right and the failure meets the agreed criteria. Rejection should be tied to the inspection standard and the acceptance window, with mechanics for return freight, risk, decontamination and refund. Without those terms, the buyer may be limited to a damages claim.
{ \”@context\”: \”https://schema.org\”, \”@type\”: \”FAQPage\”, \”mainEntity\”: [ {\”@type\”: \”Question\”, \”name\”: \”What is an inspection clause?\”, \”acceptedAnswer\”: {\”@type\”: \”Answer\”, \”text\”: \”An inspection clause is a contract term that gives the buyer a right to examine the equipment against a defined standard within a stated window, and sets out what happens if it fails. It should identify who inspects, where, using which criteria, and the remedy for a nonconformance.\”}}, {\”@type\”: \”Question\”, \”name\”: \”Should I inspect equipment before shipment?\”, \”acceptedAnswer\”: {\”@type\”: \”Answer\”, \”text\”: \”Pre-shipment inspection is useful because the buyer still has leverage before payment and freight. It can catch condition, completeness and configuration problems, but it may not reproduce the destination power, network or clinical environment. A second acceptance check after delivery is often appropriate.\”}}, {\”@type\”: \”Question\”, \”name\”: \”Who pays for inspection?\”, \”acceptedAnswer\”: {\”@type\”: \”Answer\”, \”text\”: \”The contract should allocate the cost. A common approach is that each party pays for its own inspection, and the seller pays for re-inspection after a failure that it must cure. The clause should also say who bears travel, test equipment and return freight.\”}}, {\”@type\”: \”Question\”, \”name\”: \”Can I reject equipment after delivery?\”, \”acceptedAnswer\”: {\”@type\”: \”Answer\”, \”text\”: \”Only if the contract gives you that right and the failure meets the agreed criteria. Rejection should be tied to the inspection standard and the acceptance window, with mechanics for return freight, risk, decontamination and refund. Without those terms, the buyer may be limited to a damages claim.\”}} ] }
Related articles
India CDSCO and Imported Used Medical Equipment: Licensing Before LogisticsKnowledge
ANVISA Registration and Used Medical Equipment in Brazil: The Practical PathKnowledge
TGA and Used Medical Devices: What Australian Buyers and Sellers Must CheckKnowledge
Importing Used Medical Devices into Canada: Health Canada\’s Requirements in SequenceKnowledge